Camp Roosevelt

FLOORPLANT AND CALCULATION MEMORIES WERE REQUIERED ATCOSt_771710E.jpg ATCOSt_771710-Montaje.jpg ATCOSt_771710V.jpg

Additional Info

Award Winner : Tecno Fast S.A.

Architectural Excellence : THE PROJECT CONSISTS IN THE EXECUTION OF TEMPORARY KINDERGARTEN AND ELEMENTARY CLASSROOM, OFFICES AND RESTROOMS DURING THE CONSTRUCTION OF THE NEW BUILDING. THESE CLASSROOMS ARE ORGANIZED IN DIFFERENT BLOCKS: BLOCK N°1:KINDERGARTEN AND ADMINISTRATION OFFICES, BLOCK N°2:1ST. AND 2ND, GRADE, BLOCK N°3:3ED.AND 4TH. GRADE, BLOCK N°4:5TH GRADE. EACH CLASSROOM HAS A TOTAL SIZE OF 75M2 AND CONSIST OF 5 MODULES COMBINED. EVERY BLOOK HAS ACCESS TO ITS OWN INTERIOR PLAY YARD AND IS SORROUNDED BY VEGETATION AND SPORTS FIELDS. THE PEDESTRIAN WALKWAYS ARE WELL DEFINED. THE INTERIOR OF THE CLASSROOMS HAS PLASTERBOARDS AND WOODEN FINISH. ACCORDING TO THE BUILDING LOCATION, LARGE WINDOWS WERE POSITIONES IN THE BACKSIDE TO MAXIMIZE LIGHTNING.

Cost Energy Effectiveness : STRUCTURE DESING WAS OPTIMIZED BY THE ENGINEERING DEVELOPMENT, REDUCING MATERIOAL IN FACTORY. BECAUSE OF VELOCITY AND AUTOMATION, COSTS WERE REDUCED BY SAVING TIME IN THE INSTALLATION PROCESS USING SPECIALIZED CONTACTUAL PERSONNEL AND BY REUSING 90% OF FINISHING MATERIALS BETWEEN MODULES.

Design Firm Name : TECNO FAST PERU SAC

Engineering Firm Name : TECNO FAST PERU SAC

Green Building Description : UNLIKE TRADITIONAL CONSTRUCCION, MINERAL WOOL IS USED TO KEEP ROOM TEMPETATURE AND ACOUSTINC INSULATION MINIMIZING THE USE OF ENERGY.THE USE OF WOOD FOR THE CONSTRUCTION IS SUSTAINABLE AS IT COMBINES TECHNOLOGY, FUCTIONALITY AND ESTHETICS IN A HARMONIC WAY, BLENDING WITH THE URBAN LOCAION.

Installer Firm Name : TECNO FAST PERU SAC

Occupied Date : 7/15/2017

Owner Firm Name : INSTITUTO EDUCACIONAL FRANKLIN DELANO ROOSEVELT

Production Start Date : 5/8/2017

Project Location City : Lima

Project Location State Name : Peru

Technical Innovation : DOES NOT APPLY

Total Square Feet : 3240