Dominion Power Mount Storm
Additional Info
Award Winner : Wilmot Modular Structures, Inc.
Architectural Excellence : The project consists of (9) modules totaling approximately 5,488 sq.ft. In order to achieve rigid safety requirements at the site a steel canopy system was designed and erected over the office complex. The 26 GA high-rib steel exterior finish compliments the same industrial look on surrounding existing buildings. Multiple concrete decks and ADA Ramp systems with vinyl railings were installed in several locations. They were required due to the harsh environments in the changing seasons at the site. Custom flooring finishes were selected throughout the building both for there resilience, appearance, and insulating properties. An open lab area was specifically designed for the client with an increased floor load capacity to accommodate proprietary equipment used for testing by employees.
Cost Energy Effectiveness : Due to the client’s specific jobsite requirements and the building’s location it was imperative to ensure the entire project design provided a safe working environment for the occupants. The harsh environment conditions encountered by employees throughout the year coupled with hazardous site conditions resulted in a design that was not the least expensive option. With safety being paramount, the Wilmot Modular Team developed a solution that exceeded all expectations and resulted in a successful project that will protect the occupants for many years to come. So in comparison to the value of human life, there is no price that can be set to protect or save it. In that respect, the cost effectiveness in the Wilmot solution was the most logical path to take.
Occupied Date : 9/30/2012
Production Start Date : 9/4/2012
Project Location City : Davis
Project Location State Name : WV
Technical Innovation : In the initial design phase we were asked to meet critical requirements to ensure the safety of all employees working in this building. Our first design challenge was to develop a system that could withstand 1-2 lb. missiles, ice shards that form during the winter months, which travel at 120 mph or more. Our second challenge involved coordination and tying into an existing grounding system that if done incorrectly could result in death or serious harm to site personnel or employees. The third challenge involved a rigid design that could stand up to heavy abuse, extreme climate changes, and potential water infiltration issues into the structure. The result was to design, fabricate, and erect a stand-alone steel canopy system over the office complex which achieved all of the owner’s needs.
Total Square Feet : 5488
Category : Relocatable: Office: over 5,000 sq. ft.