Gotham Health - Vanderbilt Family Health Clinic
Additional Info
Award Winner : Axis Construction Corp.
Architectural Excellence : The Vanderbilt Family Health Center is the first new healthcare facility constructed on Staten Island in over 10 years and is strategically located in a neighborhood that has the greatest and most convenient access to mass transit for patients and staff. The building incorporates Clinical Programs including Pediatrics, Women’s Health, Ophthalmology, Podiatry, Radiology, Diabetes Care as well as Behavioral Health, all meeting the stringent NYC building codes and Dept. of Health regulations. The building blended the right mix of architectural, structural, mechanical/electrical features while maintaining strict adherence to budget requirements, critical to the success of the project, as it was funded by NYC. The building features a two story curtain wall entry system allowing natural light to fill the entryway, factory applied thin-brick exterior with full parapet, ceramic tiled toilet rooms and clean, smooth interior finishes of the offices and clinic spaces for ease of maintenance.
Cost Energy Effectiveness : NYC Health & Hospitals wanted to minimize disputation to the local residents being the site chosen was in a residential neighborhood. By utilizing “off-site” construction not only were they able to open the facility, treat patients and generate revenue over nine months ahead of a conventional construction schedule, but also significantly reduced neighborhood disruption. Building this facility in a controlled environment and away from the site helped reduce time and costs in project management and general conditions, allowing NYC Health & Hospitals to meet the budget set for this capital project. Logistically the project site presented numerous challenges during the delivery and installation phase of the project. Cooperation and careful planning between all stakeholders, as well as the use of a 600ton hydraulic crane, allowed the building to be installed in just six days with minimal impact to the community.
Design Firm Name : MJCL Architects
Engineering Firm Name : Larson Design Group
Green Building Description : This LEED Silver rated building was designed with reduced operational costs, improved sustainability and enhanced indoor environmental quality in mind. The Clinic meets the critical HVAC requirements of a health care facility by utilizing roof top air handlers, VAV boxes and supplemental cooling systems for IT/Data, all of which are tied into and is controlled by a state-of-the-art building controls system. It includes high-efficiency, energy saving interior light fixtures with occupancy sensor controls in all rooms, low VOC paints, a reflective white modified Bit roofing and large insulated windows for natural day lighting.Other energy efficient properties include continuous rigid insulation on the exterior walls and roof and sprayed insulation under the floor for a superior performing building envelope.
Occupied Date : 4/2/2018
Owner Firm Name : NYC- Health & Hospital Corp
Production Start Date : 5/15/2017
Project Location City : Staten Island
Project Location State Name : NY
Technical Innovation : The non-combustible design is a structural steel post and beam assembly with light gauge infill and pre-poured concrete floors in a composite steel deck to help achieve sound deadening and fire ratings. The customized facility was built completely together at the plant as a two story structure to ensure precision fit and finish of all features and systems, resulting in a shorter site installation time and reduced on-site activity and disruption to the community. Once completed, the building was deconstructed and loaded to transporters. This process allowed the building to arrive with all the exterior brick installed as well as a high level of completion on the interior, reducing site completion time significantly. The building was designed with minimal interior columns to allow for maximum flexibility in use. Each module was designed with engineered lifting lugs for fast and simple offloading on to the foundations and a more efficient stacking process meeting exacting tolerances.
Total Square Feet : 19800
Category : Permanent: Healthcare: over 10,000 sq. ft.