Hotel Tecno Fast Village Calama
Additional Info
Award Winner : Tecno Fast S.A.
Architectural Excellence : The hotel was thought as a place that generates relax for the clients that stay, with a unique design and landscaping in the area with a large number of trees and shrubs to give a differentiation with respect to all the hotels that exist in the area. On the other hand, a series of open common spaces such as the BBQ area and terraces were generated to promote the interaction of the people staying at the hotel, a training room and a gym were also built to promote healthy living.
The hotel has universal accessibility in all its areas.
We have a restaurant with an open space concept and buffet menu which promotes interaction between people
Cost Energy Effectiveness : Modular components are manufactured and assembled in a factory environment, where there is reduced noise and dust on site. The material tolerances in the hotel are much better since everything is done with the proper tools in a controlled environment.
Design Firm Name : TECNO FAST
Engineering Firm Name : Tecno Fast
Green Building Description : The hotel Pre-fabrication makes possible the optimize material purchases and usage, while minimizing on-site waste, all while offering a higher quality product. The hotel structure is constructed off-site at the same time that the foundation and other on-site work is being completed. This efficient process reduces the impact on the surrounding environment, as well as reduces the number of vehicles and equipment needed at the site.
A large selection of high efficiency mechanical systems like insulation, windows, doors, and plumbing fixtures were installed to meet efficiency standards.
When your needs change, modular buildings can be disassembled and the modules relocated or refreshed for their next use, reducing the demand for additional raw materials.
During the construction on the ground, it only took a couple of months to get everything ready without generating any complaints from the neighbors to the hotel.
Installer Firm Name : Construcciones CIS
Occupied Date : 7/1/2018
Owner Firm Name : Tecno Fast
Production Start Date : 7/1/2017
Project Location City : Calama
Project Location State Name : II Region Antofagasta
Technical Innovation : The hotel was built with technology to make efficient and friendly with the environment within what stands out the use of solar panels for the self-generation of the all energy of the hotel, the use of the treated water of the hotel to irrigate the trees, plants and shrubs and the use of recycled materials in the construction of the modules to decrease the carbon footprint.
Total Square Feet : 3500
Category : Relocatable: Hotel: under 10,000 sq. ft.