Medical Education Training Center (METC)
Additional Info
Award Winner : Warrior Group
Architectural Excellence : The challenges facing the design build team on this project were complex and on a grand scale due the very size if the building and the system requirements of the customer. Issues such as phasing of construction, interface points between trades for utilities, and alignment data points for structural elements all had to be worked out to assure a smooth process. The complexity of the customer’s system requirements made this a natural for the highly controlled and monitored factory modular construction process. Cost effectiveness was achieved through construction efficiencies inherent in the manufacturing process. Costly rework on site was almost nonexistent.
Cost Energy Effectiveness : Energy efficiencies for this type of construction are outstanding. This building exceeds the stringent standards set by ASHRA 90.1-2007 by a full 30%. This savings takes on even more significance when you consider that 74% of all electricity and 39% of all energy that’s produced is used by buildings.
Design Firm Name : Jacobs Architects
Occupied Date : 3/12/2010
Production Start Date : 10/29/2009
Project Location City : San Antonio
Project Location State Name : TX
Technical Innovation : These structures meet the strict requirements of the military Uniform Facilities Code (UFC), which is the guideline for all military base construction. Section 4-010-01, Appendix B of the UFC addresses “Anti-Terrorist Force Protection”, which specifies the design and incorporation of Progressive Collapse systems for modular structures as well as blast resistant windows. Permanent Modular Units for Second, Third and Fourth Floor Warrior Group project managed the production of (277) 13’8” X 60’ permanent modular units and 64 half units for each building. Strict design adherence was paramount along with quality control. In addition to the manufacturing internal quality control program, Warrior Group staffed quality control personnel and a third party inspector in each factory during production. The exterior is split spaced block with stucco, providing a pleasant, contemporary appearance. Buildings are U shaped like the letter “E” offering idyllic Views from windows.
Total Square Feet : 520000
Category : Permanent: Education: over 10,000 sq. ft.